🇳🇱 🇬🇧 🇩🇪 🇫🇷
Home Computer Floors System Floors Modifications Stairs & Ramps Ship Floors Projects About Knowledge Base Contact Request Quote
Tripolis office complex in Amsterdam, raised floor installed by Anomalie System Floors

Our
Projects

From datacenters in Amsterdam to industrial installations at Umicore. Explore a selection of the projects we are proud to have delivered.

Who we serve

A Selection of Recent Projects

AMS1 datacenter on the Archangelkade in Amsterdam, where Anomalie supplied and installed the raised computer floor and ramps
Datacenter · Amsterdam
AMS1
650 m²

Raised computer floor with two ramps, installed in phases in a live datacenter.

Edge Amsterdam West on the Basisweg, renovated office building with 60,000 m² of raised floor installed by Anomalie
Office · Amsterdam West
Edge West
60.000 m²

Raised floor in a fully renovated office building, as a subcontractor of Wurks.

Nike campus in Hilversum with building SB, where Anomalie supplied and installed 3,440 m² of raised computer floor
Office · Hilversum
Nike
3.440 m²

Raised computer floor with 112 floor boxes, delivered in four months.

Anomalie installers laying the low computer floor with aluminium finished panels in the JP Morgan office in Amsterdam
Office · Amsterdam
JP Morgan
561 m²

Computer floor with server room and two ramps, laid in two weeks.

EXA data hall with raised floor, rows of adjustable ventilation tiles and cable openings, supplied and installed by Anomalie
Datacenter · Rotterdam and Stabroek
EXA
331 m²

Datacenter floors at 600 mm with 87 adjustable ventilation tiles and ramps.

Umicore industrial site in Hoboken, where Anomalie has looked after the raised floors in the switch rooms for 26 years
Industry · Hoboken
Umicore
26 years

Replacement and repair of system floors in switch rooms.

Tripolis office complex on the Zuidas in Amsterdam, where Anomalie installed the raised floor on several storeys
Office · Amsterdam
Tripolis
2021 to 2023

Raised floor on several storeys of Tripolis on the Zuidas, as a subcontractor of Wurks.

New Qirion substation where Anomalie installed the raised system floor on a steel substructure
Energy · Substations
Qirion Substations
5 stations

System floors on steel substructure in new Qirion substations, built in two phases.

Wonderwoods office building in Utrecht, where Anomalie lowered the existing raised floor
Office · Utrecht
Wonderwoods
240 m²

Existing raised floor lowered for the Eurail office, reusing the panels.

UWV office building in Amsterdam, where Anomalie inspected the entire computer floor
Office · Amsterdam
UWV
2 days

Entire office computer floor inspected for rocking panels, commissioned by Maasmond.

Control room of EECV in the Europoort with floor panels partly removed during the replacement by Anomalie
Control room · Europoort
EECV Europoort
113 m²

New antistatic floor panels in a control room that stayed in operation during the works.