New Qirion substation where Anomalie installed the raised system floor on a steel substructure

Project
Qirion

Energy

The Assignment

Since 2024, Anomalie has been installing the raised system floors in new substations for Qirion, the grid builder of Alliander, as a subcontractor of System Floor Technics. Locations include Harderwijk, Lelystad, Almere, 't Harde and 't Veld. Each station has 118 to 168 m² of floor on a steel substructure. The work is done in two phases: first the substructure with a temporary cover so construction can continue, then the final floor panels, the steel spare sections and the edge sealing.

Project Details

Key Facts

ClientSystem Floor Technics
End clientQirion
SectorEnergy infrastructure
Floor typeRaised system floor on steel substructure
Floor area118 to 168 m² per station
LocationHarderwijk, Lelystad, Almere, 't Harde and 't Veld
Period2024 to 2026
ExtrasTemporary cover, steel spare sections of 3240 mm, edge sealing with compriband

Photos

Related

See Also

More
Computer Floors
Modular raised floors for datacenters, offices and cleanrooms.
More
Control Stations
Read more about our floors for substations and control stations.
More
All Projects
See more projects in offices, datacenters, industry and shipping.