Request Quote
Since 2024, Anomalie has been installing the raised system floors in new substations for Qirion, the grid builder of Alliander, as a subcontractor of System Floor Technics. Locations include Harderwijk, Lelystad, Almere, 't Harde and 't Veld. Each station has 118 to 168 m² of floor on a steel substructure. The work is done in two phases: first the substructure with a temporary cover so construction can continue, then the final floor panels, the steel spare sections and the edge sealing.
| Client | System Floor Technics |
|---|---|
| End client | Qirion |
| Sector | Energy infrastructure |
| Floor type | Raised system floor on steel substructure |
| Floor area | 118 to 168 m² per station |
| Location | Harderwijk, Lelystad, Almere, 't Harde and 't Veld |
| Period | 2024 to 2026 |
| Extras | Temporary cover, steel spare sections of 3240 mm, edge sealing with compriband |
A fixed method for a series of stations: the same build-up and the same two-phase schedule, so every station is delivered quickly and predictably.