Request Quote
For the new Eurail office in Wonderwoods, the green office building in Utrecht, Anomalie lowered the existing raised floor on behalf of Julia. We removed 240 m² of floor, took out the old pedestals and adhesive residue, and put the floor back on new, lower pedestals, with an extra pedestal in the middle of each tile. We reused the existing panels. After the cabling and the floor boxes were installed, we bonded Fermacell boards over the floor as a solid base for the finish.
| Client | Julia |
|---|---|
| End client | Eurail |
| Sector | Offices |
| Floor type | Lowering an existing raised floor |
| Floor area | 240 m² |
| Location | Wonderwoods, Utrecht |
| Period | September 2024 |
| Floor panels | Existing panels reused |
| Finish | Fermacell boards bonded over the floor |
| Extras | Openings of 261 x 261 mm for floor boxes, 80 mm holes for sockets |
A lower, level and quiet floor for the Eurail office, reusing the existing panels.